FAAC International, Inc. 303 Lexington Avenue Cheyenne, WY 82007 www.faacusa.com June, 2004 750 Operator And 455 D Control Panel Installation Manual
CONNECT THE HYDRAULIC LINES Caution: It is important that the hydraulic lines be kept clean of any debris. The drive unit and power unit are connect
Page 11 June, 2004 750 Operator And 455 D Control Panel Installation Manual a minimum of 5 3/4 in. (2.1 cm) long and must be as wide as the gate lea
Page 12 June, 2004 750 Operator And 455 D Control Panel Installation Manual Axis of rotation for gate leafCenterline of gate leafVertical section ca
ABCDEFPage 13 June, 2004 750 Operator And 455 D Control Panel Installation Manual Figure 11. Typical layout of gate system with 750 Operators
Page 14 June, 2004 750 Operator And 455 D Control Panel Installation Manual With the hydraulic system disengaged, open the gate leaf by hand to a ha
Page 15 June, 2004 750 Operator And 455 D Control Panel Installation Manual Figure 13. The 750 Extension Arm Side ViewTop View750/ 760 collarAttac
Page 16 June, 2004 750 Operator And 455 D Control Panel Installation Manual 750 OPERATOR
Page 17 June, 2004 750 Operator And 455 D Control Panel Installation Manual 750 PARTS LIST POS PART NO. DESCRIPTION QTY 1 N/A Bolt (10mm x 25mm
June, 2004 750 Operator And 455 D Control Panel Installation Manual Page 18 750 CBAC OPERATOR
POS PART NO. DESCRIPTION QTY 28 2274 Allen Bolt (4mm x 6mm) 1 29 4180225 Manual Release 1 30 7090050015 O-Ring (10.82mm x 1.78 mm) 6 31 7
Both the installer and the owner and/or operator of this system need to read and understand this installation manual and the safety instructions suppl
750 PUMP ENCLOSURE POS PART NO. DESCRIPTION QTY 1 N/A Self-tapping screw (3.9mm x 9.5mm) 1 2 N/A Washer 1 3 N/A Snap Ring 1 4 N/A O-Ring
Page 21 June, 2004 750 Operator And 455 D Control Panel Installation Manual 750 FLEX HOSE CONNECTOR KIT LEGEND A Flexible Hydraulic Hose B Flex-hose
THE 455 D CONTROL PANEL GENERAL DESCRIPTION The FAAC 455 D control panel is used to operate the following models. Swing gate operators: 400 412 4
RADIO1-455D115 = 115V1-455D = 230VF2F1MMK+OP -CL+24 VFS WNC -B -STOPA + TXFS WW. L.LOCK9 10 11 12 13 14 15 16 17 18 1922 23 24 25LA MPCOMOP CLMOTOR 1M
NOTE: In order to comply with UL 325, two setsof FAAC photobeams must be installed. One setshould be 6 in. outside the closed gate(s) and actas a clos
FSWOPFSWCLOP_AOP_BSTOPFCA1FCA2FCC1FCC2Page 25 June, 2004 750 Operator And 455 D Control Panel Installation Manual ACTIVATING DEVICES AND RADIO RECE
• E (semi-automatic): This mode requires a command to open and a command to close. A second command during opening stops the gate. A second command
Magnetic LockShadow LoopRev ersing Photocells(f or closing)3 & 4 Wire Radio Receiv ersN.C.N.O.COMN.C.N.O.COM1714182112 vacRelay+-Lock121978NCCCoil
Page 28 June, 2004 750 Operator And 455 D Control Panel Installation Manual PROGRAMMING To program the automated system, the “Programming Mode” mus
Page 29 June, 2004 750 Operator And 455 D Control Panel Installation Manual ADVANCED PROGRAMMING + Display Function Default MAXIMUM TORQUE AT IN
June, 2004 750 Operator And 455 D Control Panel Installation Manual Model Duty Cycle Typical Use Class I: Residential Vehicular Gate Operator 402
Page 30 June, 2004 750 Operator And 455 D Control Panel Installation Manual and 14, or radio control): • When gate operator (1) reaches the positi
Page 31 June, 2004 750 Operator And 455 D Control Panel Installation Manual The procedure has ended and the gate is ready to operate, using default
Page 32 June, 2004 750 Operator And 455 D Control Panel Installation Manual THE 455 D CONTROL PANEL INSTALLATION INSTRUCTIONS A (Automatic) Logic (4
Page 33 June, 2004 750 Operator And 455 D Control Panel Installation Manual THE 455 D CONTROL PANEL INSTALLATION INSTRUCTIONS E (Semi-automatic) Log
THE 750 OPERATOR The FAAC recommended maintenance schedule varies according to the frequency of use of the operators, whether lightly used operators
Page 35 June, 2004 750 Operator And 455 D Control Panel Installation Manual SAFETY IN GATE DESIGN • A gate is a potential traffic hazard, so it is
Problem: The gate does not respond to an activating signal. Solution: Verify that you have correctly wired the operator to the control panel. Verif
Page 37 June, 2004 750 Operator And 455 D Control Panel Installation Manual Check to see that there are no obstructions in the path of the gate or t
Page 38 June, 2004 750 Operator And 455 D Control Panel Installation Manual OPERATOR LOCATION WHEN USING THE EXTENSION ARMS WITH STOPS 2" 2&q
Page 39 June, 2004 750 Operator And 455 D Control Panel Installation Manual This page left blank intentionally. Your Notes
Page 4 June, 2004 750 Operator And 455 D Control Panel Installation Manual TECHNICAL DATA THE 750 OPERATOR Description 750 Standard 750 Long Lea
Page 40 June, 2004 750 Operator And 455 D Control Panel Installation Manual To the original purchaser only: FAAC International, Inc., warrants, for
Page 5 June, 2004 750 Operator And 455 D Control Panel Installation Manual UNPACKING THE OPERATOR When you receive your 750 Operator, complete the f
Page 6 June, 2004 750 Operator And 455 D Control Panel Installation Manual INSTALLATION INSTRUCTIONS THE 750 OPERATOR GENERAL CHARACTERISTICS The
Page 7 June, 2004 750 Operator And 455 D Control Panel Installation Manual Figure 3. Recommended dimensions for the concrete footing and foundatio
Page 8 June, 2004 750 Operator And 455 D Control Panel Installation Manual INSTALL THE POWER UNIT Figure 5 shows important dimensions and parts of
Page 9 June, 2004 750 Operator And 455 D Control Panel Installation Manual Figure 5. Parts of the Power Unit in the vinyl box Caution: NEVER weld
Kommentare zu diesen Handbüchern